This project included the rehabilitation of existing pipelines and the extension of new pipelines, totaling 210 km and 180 km, respectively.
To ensure the success of the project, detailed surveys were conducted to gather essential data for the design process. This included assessing the condition and location of existing pipelines, as well as determining the alignment and layout of the new pipelines.
In addition to the pipeline works, Pamodzi Consulting Limited also designed and supervised the construction of 5 storage tanks and 3 booster stations. These structures were crucial for storing and distributing water effectively throughout Lilongwe City.
Throughout the construction phase, Pamodzi Consulting Limited provided comprehensive supervision to ensure that all activities adhered to the design specifications. This involved overseeing the entire project, managing any contractual issues, and implementing quality control measures to meet the required standards.
The expertise of Pamodzi Consulting Limited in detailed design and construction supervision played a vital role in the successful implementation of this water distribution network rehabilitation and expansion project. Their knowledge in pipeline design, storage tank and booster station design, tender document production, works supervision, quality control, and general contract management was essential in delivering this crucial infrastructure project.